Case Study - ANZAC Class Frigate Obsolescence Upgrade

BAE Systems Logo

Delivering a comprehensive control & management solution to one of Australia's most important Naval assets.

The Goal

The ANZAC Class Frigates are a mainstay of the Royal Australian Navy and ensuring that they are well maintained and operating as effectively as possible is critical.

Overall, a number of elements of the control & monitoring system (C&M) required improvements to ensure maximum operational efficiency. The fleet was fitted with Siemens S5 PLC’s, which are no longer supported by Siemens. It was also utilising dated SCADA systems and required additional redundancies in its system servers & controllers.

The Solution

I S Systems’ expertise in the implementation of S5 to S7 upgrades made us the ideal choice for the implementation of this strategy. We implemented an efficient, minimal-downtime upgrade path paired with a comprehensive and detailed risk management strategy. This facilitated the upgrade from S5 to S7 PLC’s, a SCADA system upgrade and C&M System with a redundant fibre optic communications network ensuring robust communication throughout the system.

Our strategy permitted offline verification and testing, ensuring the reliability of the solution before going live.

Anzac class frigate in dock
ANZAC Class frigate at sea

Every time I hear the story (of I S Systems Support of the project) it resonates me as an exemplar of what can be achieved with strong leadership & decision making... There are many more in Defence and Government that would benefit from having an exemplar case study such as yours.

The I S Systems capability in support of ANZAC is a story worth telling.

Tony Martin
Manager Global Access Program, BAE Systems Australia

More Case Studies

Mining

Rowell Highway Power Station

When the need arose to replace 18 obsolete Modicon PLCs with modern Siemens S7-1500 PLCs, I S Systems was tasked with delivering a seamless, compliant, ...
Read More →
Industrial

Sunshine Sugar Harwood Mill

Modernising Reliability with a Complete Sugar Bagger PLC Upgrade
Read More →
Generator Control Panels, Instrumentation & alternator
Energy

Ship Generator Control Upgrade

A narrow delivery timeline for a dry-dock maintenance window presented an opportunity for I S Systems to provide a speedy, low downtime solution.
Read More →
Copper Tube Finished product
Industrial

Copper Tube Line PLC & Drive Upgrade

In this project, I S Systems delivered replacements of the PLC, DC Drives, Saw Motor/Gearbox & AC drive, and an upgrade of analogue control modules for a ...
Read More →
Bucket Wheel Reclaimer
Mining

Improving Bucket Wheel Reclaimer Reliability

I S Systems partnership with iba-Oceania delivered an logging and analysis package that greatly improved reliability of a Port Headland bucket wheel reclaimer.
Read More →
Conveyors at the center of the award winning s5 to s7 PLC upgrade
Mining

Award Winning PLC Upgrade

I S Systems implementation of the S5-to-S7 upgrade garnered industry recognition and solidified our presence as a leading expert in PLC upgrade strategies.
Read More →